Space planning
We measure the room, model circulation and seat count, and issue a layout your architect can sign.
Coimbatore · Ernakulam · Export
Steelwud plans, engineers, manufactures and installs the furniture that institutions run on — classrooms, laboratories, hostels, libraries and hospital wards.
Position
We do not sell furniture. We plan the room, engineer the piece, manufacture it in our own plants, deliver it across India and install it before the term begins.
Institutional furniture fails at the joint, not the surface. Every Steelwud frame is proof-loaded, every edge is radiused, and every finish is rated for a wipe-down twice a day for ten years.
Products are organised by room, application and user — not by product type — so a procurement officer can specify a whole floor in one pass.

Desks, benches, storage walls, activity tables and Montessori sets, sized by age band from KG through senior secondary.
View range →
Bedside units, attendant seating, treatment trolleys and chemical-resistant laboratory benching with epoxy or phenolic tops.
View range →
Auditoria, libraries, hostels and staff rooms produced to an architect's drawing set, with shop drawings issued for approval before cutting.
View range →
Flat-pack engineering, fumigated packing and container load plans for GCC, African and South-East Asian institutional projects.
View range →Four stages, one accountable team. No sub-contracted gaps between the drawing and the delivered room.
We measure the room, model circulation and seat count, and issue a layout your architect can sign.
Ergonomic heights by age band, radiused edges, joint detailing and a proof-load target before a single part is cut.
Seasoning, CNC cutting, welding, powder coating and finishing under one roof across two plants — so the schedule is ours to keep.
Sequenced to your academic calendar, installed by our own crews, handed over room by room with a snag list closed on site.
Institutional buyers do not need adjectives. These are the numbers a procurement committee actually asks for.
Across schools, colleges, hostels and hospitals.
Lab, university, college, classroom, KG, office, hospital, Montessori, hostel.
Static seat load tested on production samples, not prototypes.
On frame and joinery, with spares held for the warranty term.
Every surface on this list is specified for a wipe-down twice a day, a decade of it. Select one to preview the finish.
Build a project list as you browse, then send the whole list as one enquiry.
12 products shown
Production samples are loaded to 150 kg static and held. Tap the rig to add calibrated weights.
Matter.js rigid-body simulation · illustrative, not a certified test record
Requirement, solution, quantity, location, execution time, result — the format a procurement officer can compare against their own brief.
Written for the people who actually sign the order — principals, architects, procurement officers and hospital administrators.
Ergonomics
The five-size ladder from KG to senior secondary, and how to specify a mixed-age room without buying twice.
Procurement
Material call-outs, load tests, finish thickness and warranty scope — where quotes diverge and how to compare them honestly.
Planning
Seat count, circulation width and sightlines for each arrangement, with the floor area each one actually needs.
Tell us the rooms and we will come back with a specification, a layout and a price — usually within one working day.